Client: Henry Construction. Contract sum: £360K
Works included, first fix carpentry- timber studwork, windows boards, and stair cases.
2nd fix carpentry – oak hand rails to communal hallways, oak handrails to stairs, Door sets, skirting, architrave, boxings to SVP, make and install built in wardrobes
Final fix – ironmongery to all doors, Doc M packs, mirrors other fixtures and fittings required by the client